Brand Name : Tecon
Model Number : HD8918-F-B
Place of Origin : China
MOQ : 1 Set Production Line
Price : Negotiation
Payment Terms : T/T, L/C
Supply Ability : 16Pcs Per Year
Delivery Time : 3-5 months after received your payment
Certification : CE
Packaging Details : Wooden case
Bag Length (mm) : 380-825
Bag width (mm) : 350-550
Bottom width (mm) : 90-175
Bottom center distance (mm) : 290-650
plate valve length (mm) : 120-250
Extranal strength sheet (mm) : 270-490
pumping rate of vacuum pump : 250*3/h
normal speed : 60-80bags/min
Valve Sheet Pasting and Auto-Gluing Bottomer Machine with Big S Unit
Configuration | HDA003 Feeding unit |
HDB003 Puncturing air hole unit | |
HDC002 Bottom-opening Unit | |
HDE003 Plate valve unit | |
HDE008 Valve sheet pasting and automatic gluing | |
HDF004 Bag forming unit | |
HDE0125 External reinforcement unit (servo) | |
HDG009 Bottom revising unit | |
HDL002 Big S unit |
Remark of the Bottomer Machine HD8918-F-B
HD | Bottomer in Chinese for short. |
89 | First bottomer was developed successfull. |
18 | Bottom width max.180mm. |
F | Paper bag plate type valve. |
B | Paper bag bottom outer strengthen sheet. |
Machine description
HD8918-F-B bottomer is on the basis of HD8918-F-B with reinforcement unit,which make the bottom of the bag more strong, beautiful, stronger practicability. At the same time, the strengthen sheet can be synchronized printing or separated printing.
Process Description
High-speed Rotary Vacuum Feeding → Puncturing Vent Hole and Creasing → Tubes Delivery → Bottom-Opening → Valve Sheet Pasting → Automatic Gluing → Bottom-pasting and Bag Forming → External Reinforcement Sheet Pasting → Bottom Revising → Bags Counting and Palletizing → Programmable Logic Controller(PLC)
Installation, commissioning & training:
For installation, our company will send working team to install the machine.
1) We dispatch working team to supervise installation and commissioning. The buyer’s skillful technical persons, labor force, auxiliary equipment, necessary tools and materials should be available for the installation and commissioning.
2) We provide training during and after the commissioning at the buyer’s site.
3) We also provide training at the seller’s site.
4) Generally 5 technicians for the installation, commissioning and training.
5) The buyer is in charge of the cost of transportation and accommodation of our working team and pay100 USD/day for each person.
Warranty:
24 months from the acceptance at the buyer’s site. Hardware will be replaced for free during warranty period excluding the damages under mistaken operation and maintenance.
Spare parts:
1. We provide spare parts for commissioning and buyers should prepare spare parts for their normal production.
2. After expiry of warranty period, we provide spare parts only at basic cost.
Plant construction:
We will provide full solution for the buyer’s plant construction according to the buyer’s requirements.